Documentation is what turns a working line into a line somebody else can run, maintain and prove. LVP Automation produces the paperwork that goes with conveyor and automation systems: risk assessments, Functional Design Specifications, System Design Specifications, and qualification records for sites that have to demonstrate a system does what it was specified to do.
Regulated sites usually need more than an operating manual. Design specifications have to be written before the build, so there is something definite to test the finished line against, and qualification records have to show that what was installed matches what was agreed. We write documents to be read and checked by the people who inherit the line, rather than filed unopened. We are based in Finglas, Dublin 11 and work with customers across Ireland.
Risk assessment. A record of the hazards a line presents where it is installed, what has been done about each one, and what risk is left afterwards. Guarding, access, trapping points, stored energy, emergency stops and the places people actually put their hands. It is site-specific by nature, because the same conveyor in a different building is a different set of risks.
Functional Design Specification. What the system is supposed to do, described in language the people buying it can check. Rates, sequences, what happens when something jams, who is allowed to reset what. Written before the build, it becomes the thing the finished line is tested against.
System Design Specification. How the system is built to meet the FDS. Layout, drives, control architecture, panel content, I/O, safety circuit. This is the document that saves a maintenance team a day of tracing wiring in three years.
Qualification records. Evidence rather than assertion: what was checked, on what date, by whom, and against which clause of the specification.
A specification written afterwards describes what was built. A specification written beforehand describes what was wanted, which is the only version worth testing against. It is also the cheapest moment to find a disagreement: changing a sentence costs nothing, and changing a fabricated line costs a great deal. Where a project has gone wrong at handover, the cause is very often that nobody wrote down the target before work started.
Some sites have to satisfy an auditor as well as an engineer. Where that applies, the documents have to be traceable, dated, attributable and consistent with each other, and the qualification records have to point back to numbered requirements in the specification rather than to a general assurance that everything was fine. We can produce documentation in that form and to the protocols your site already works to.
Documentation is usually produced alongside the work it describes. Design specifications sit with conveyor system design, control descriptions with PLC programming, and panel drawings and schedules with electrical control panel building. Where documentation is needed for a line already installed, it often follows an on-site survey.
Can you document a system you did not supply? Yes. This is a common request, usually where a line was installed years ago, the drawings no longer match what is on the floor, and nobody can say why a particular interlock exists. The work starts with a survey of what is actually installed.
We already have the manufacturer manuals. Is that not enough? Manuals describe equipment. Documentation describes your system: how those pieces were put together, what the line is supposed to do, and what was verified on your site. An auditor asking whether the installed line matches its specification cannot be answered with a supplier catalogue.
Can you write the specification before we commit to a design? Yes, and that is the more useful order. An FDS agreed early gives everyone the same picture of what is being bought, and gives you something to hold the build against.
What if our drawings no longer match the line? Then the first job is to establish what is really there. Redrawing from an outdated set simply preserves the error in a tidier format.
Where do you cover? We are based in Finglas, Dublin 11 and work with customers across Ireland.
Have a question about our conveyor systems or need a tailored automation solution for your business? Our team at LVP Automation is here to help. Fill out the form below with your details, and we’ll get back to you as soon as possible. Whether you need a quote, technical support, or more information on our products, we’re ready to assist.